Library rt.analysis.basic.bertogna_edf_theory

Require Import rt.util.all.
Require Import rt.model.basic.task rt.model.basic.job rt.model.basic.task_arrival
               rt.model.basic.schedule rt.model.basic.platform rt.model.basic.interference
               rt.model.basic.workload rt.model.basic.schedulability rt.model.basic.priority
               rt.model.basic.platform rt.model.basic.response_time
               rt.model.basic.constrained_deadlines.
Require Import rt.analysis.basic.workload_bound rt.analysis.basic.interference_bound_edf.
From mathcomp Require Import ssreflect ssrbool eqtype ssrnat seq fintype bigop div path.

Module ResponseTimeAnalysisEDF.

  Export Job SporadicTaskset Schedule ScheduleOfSporadicTask Workload Schedulability ResponseTime
         Priority SporadicTaskArrival WorkloadBound InterferenceBoundEDF
         Interference Platform ConstrainedDeadlines.

  (* In this section, we prove that any fixed point in Bertogna and
     Cirinei's RTA for EDF scheduling is a safe response-time bound.
     This analysis can be found in Chapter 17.1.2 of Baruah et al.'s
     book Multiprocessor Scheduling for Real-time Systems. *)

  Section ResponseTimeBound.

    Context {sporadic_task: eqType}.
    Variable task_cost: sporadic_task time.
    Variable task_period: sporadic_task time.
    Variable task_deadline: sporadic_task time.

    Context {Job: eqType}.
    Variable job_cost: Job time.
    Variable job_deadline: Job time.
    Variable job_task: Job sporadic_task.

    (* Assume any job arrival sequence... *)
    Context {arr_seq: arrival_sequence Job}.

    (* ... in which jobs arrive sporadically and have valid parameters. *)
    Hypothesis H_sporadic_tasks:
      sporadic_task_model task_period arr_seq job_task.
    Hypothesis H_valid_job_parameters:
       (j: JobIn arr_seq),
        valid_sporadic_job task_cost task_deadline job_cost job_deadline job_task j.

    (* Consider a task set ts where all tasks have valid parameters
       and constrained deadlines, ... *)

    Variable ts: taskset_of sporadic_task.
    Hypothesis H_valid_task_parameters:
      valid_sporadic_taskset task_cost task_period task_deadline ts.
    Hypothesis H_constrained_deadlines:
       tsk, tsk ts task_deadline tsk task_period tsk.

    (* ... and assume that all jobs in the arrival sequence come from the task set. *)
    Hypothesis H_all_jobs_from_taskset:
       (j: JobIn arr_seq), job_task j ts.

    (* Next, consider any schedule such that...*)
    Variable num_cpus: nat.
    Variable sched: schedule num_cpus arr_seq.

    (* ...jobs are sequential and do not execute before their
       arrival times nor longer than their execution costs. *)

    Hypothesis H_sequential_jobs: sequential_jobs sched.
    Hypothesis H_jobs_must_arrive_to_execute:
      jobs_must_arrive_to_execute sched.
    Hypothesis H_completed_jobs_dont_execute:
      completed_jobs_dont_execute job_cost sched.

    (* Assume that there exists at least one processor. *)
    Hypothesis H_at_least_one_cpu: num_cpus > 0.

    (* Assume that the schedule is a work-conserving EDF schedule. *)
    Hypothesis H_work_conserving: work_conserving job_cost sched.
    Hypothesis H_edf_policy: enforces_JLDP_policy job_cost sched (EDF job_deadline).

    (* Let's define some local names to avoid passing many parameters. *)
    Let no_deadline_is_missed_by_tsk (tsk: sporadic_task) :=
      task_misses_no_deadline job_cost job_deadline job_task sched tsk.
    Let response_time_bounded_by (tsk: sporadic_task) :=
      is_response_time_bound_of_task job_cost job_task tsk sched.

    (* Next we consider the response-time recurrence.
       Assume that a response-time bound R is known...  *)

    Let task_with_response_time := (sporadic_task × time)%type.
    Variable rt_bounds: seq task_with_response_time.

    (* ...for any task in the task set, ... *)
    Hypothesis H_rt_bounds_contains_all_tasks: unzip1 rt_bounds = ts.

    (* ... where R is a fixed-point of the response-time recurrence, ... *)
    Let I (tsk: sporadic_task) (delta: time) :=
      total_interference_bound_edf task_cost task_period task_deadline tsk rt_bounds delta.
    Hypothesis H_response_time_is_fixed_point :
       tsk R,
        (tsk, R) rt_bounds
        R = task_cost tsk + div_floor (I tsk R) num_cpus.

    (* ..., and R is no larger than the deadline. *)
    Hypothesis H_tasks_miss_no_deadlines:
       tsk_other R,
        (tsk_other, R) rt_bounds R task_deadline tsk_other.

    (* In order to prove that R is a response-time bound, we first provide some lemmas. *)
    Section Lemmas.

      (* Let (tsk, R) be any task to be analyzed, with its response-time bound R. *)
      Variable tsk: sporadic_task.
      Variable R: time.
      Hypothesis H_tsk_R_in_rt_bounds: (tsk, R) rt_bounds.

      (* Consider any job j of tsk ... *)
      Variable j: JobIn arr_seq.
      Hypothesis H_job_of_tsk: job_task j = tsk.

      (* ... that did not complete on time, ... *)
      Hypothesis H_j_not_completed: ¬ completed job_cost sched j (job_arrival j + R).

      (* ... and that is the first job not to satisfy its response-time bound. *)
      Hypothesis H_all_previous_jobs_completed_on_time :
         (j_other: JobIn arr_seq) tsk_other R_other,
          job_task j_other = tsk_other
          (tsk_other, R_other) rt_bounds
          job_arrival j_other + R_other < job_arrival j + R
          completed job_cost sched j_other (job_arrival j_other + R_other).

      (* Let's call x the interference incurred by job j due to tsk_other, ...*)
      Let x (tsk_other: sporadic_task) :=
        task_interference job_cost job_task sched j tsk_other
                          (job_arrival j) (job_arrival j + R).

      (* ...and X the total interference incurred by job j due to any task. *)
      Let X := total_interference job_cost sched j (job_arrival j) (job_arrival j + R).

      (* Recall Bertogna and Cirinei's workload bound ... *)
      Let workload_bound (tsk_other: sporadic_task) (R_other: time) :=
        W task_cost task_period tsk_other R_other R.

      (*... and the EDF-specific bound, ... *)
      Let edf_specific_bound (tsk_other: sporadic_task) (R_other: time) :=
        edf_specific_interference_bound task_cost task_period task_deadline tsk tsk_other R_other.

      (* ... which combined form the interference bound. *)
      Let interference_bound (tsk_other: sporadic_task) (R_other: time) :=
        interference_bound_edf task_cost task_period task_deadline tsk R (tsk_other, R_other).

      (* Based on the definition of a different task, ... *)
      Let other_task := different_task tsk.

      (* ...let other_tasks denote the set of tasks that are different from tsk. *)
      Let other_tasks :=
        [seq tsk_other <- ts | other_task tsk_other].

      (* Now we establish results the interfering tasks. *)
      Section LemmasAboutInterferingTasks.

        (* Let (tsk_other, R_other) be any pair of higher-priority task and
           response-time bound computed in previous iterations. *)

        Variable tsk_other: sporadic_task.
        Variable R_other: time.
        Hypothesis H_response_time_of_tsk_other: (tsk_other, R_other) rt_bounds.

        (* Note that tsk_other is in the task set, ...*)
        Lemma bertogna_edf_tsk_other_in_ts: tsk_other ts.
        Proof.
          rewrite set_mem -H_rt_bounds_contains_all_tasks.
          by apply/mapP; (tsk_other, R_other).
        Qed.

        (* ... and R_other is larger than the cost of tsk_other. *)
        Lemma bertogna_edf_R_other_ge_cost :
          R_other task_cost tsk_other.
        Proof.
          by rewrite [R_other](H_response_time_is_fixed_point tsk_other);
            first by apply leq_addr.
        Qed.

        (* Since tsk_other cannot interfere more than it executes, we show that
           the interference caused by tsk_other is no larger than workload bound W. *)

        Lemma bertogna_edf_workload_bounds_interference :
          x tsk_other workload_bound tsk_other R_other.
        Proof.
          unfold valid_sporadic_job in ×.
          rename H_all_previous_jobs_completed_on_time into BEFOREok,
                 H_valid_job_parameters into PARAMS,
                 H_valid_task_parameters into TASK_PARAMS,
                 H_constrained_deadlines into RESTR,
                 H_tasks_miss_no_deadlines into NOMISS.
          unfold x, task_interference.
          have INts := bertogna_edf_tsk_other_in_ts.
          apply leq_trans with (n := workload job_task sched tsk_other
                                         (job_arrival j) (job_arrival j + R));
            first by apply task_interference_le_workload.
          by apply workload_bounded_by_W with (task_deadline0 := task_deadline)
               (job_cost0 := job_cost) (job_deadline0 := job_deadline); try (by ins); last 2 first;
            [ by apply bertogna_edf_R_other_ge_cost
            | by ins; apply NOMISS
            | by ins; apply TASK_PARAMS
            | by ins; apply RESTR
            | by ins; apply BEFOREok with (tsk_other := tsk_other)].
        Qed.

        (* Recall that the edf-specific interference bound also holds for tsk_other. *)
        Lemma bertogna_edf_specific_bound_holds :
          x tsk_other edf_specific_bound tsk_other R_other.
        Proof.
          apply interference_bound_edf_bounds_interference with (job_deadline0 := job_deadline)
                                                                  (ts0 := ts); try (by done);
            [ by apply bertogna_edf_tsk_other_in_ts
            | by apply H_tasks_miss_no_deadlines
            | by apply H_tasks_miss_no_deadlines | ].
          by ins; apply H_all_previous_jobs_completed_on_time with (tsk_other := tsk_other).
        Qed.

      End LemmasAboutInterferingTasks.

      (* Next we prove some lemmas that help to derive a contradiction.*)
      Section DerivingContradiction.

      (* 0) Since job j did not complete by its response time bound, it follows that
            the total interference X >= R - e_k + 1. *)

      Lemma bertogna_edf_too_much_interference : X R - task_cost tsk + 1.
      Proof.
        rename H_completed_jobs_dont_execute into COMP,
               H_valid_job_parameters into PARAMS, H_response_time_is_fixed_point into REC,
               H_job_of_tsk into JOBtsk, H_j_not_completed into NOTCOMP.
        unfold completed, valid_sporadic_job in ×.
        unfold X, total_interference; rewrite addn1.
        rewrite -(ltn_add2r (task_cost tsk)).
        rewrite subh1; last by rewrite [R](REC tsk) // leq_addr.
        rewrite -addnBA // subnn addn0.
        move: (NOTCOMP) ⇒ /negP NOTCOMP'.
        rewrite neq_ltn in NOTCOMP.
        move: NOTCOMP ⇒ /orP [LT | BUG]; last first.
        {
          exfalso; rewrite ltnNge in BUG; move: BUG ⇒ /negP BUG; apply BUG.
          by apply cumulative_service_le_job_cost.
        }
        apply leq_ltn_trans with (n := (\sum_(job_arrival j t < job_arrival j + R)
                                     backlogged job_cost sched j t) +
                                   service sched j (job_arrival j + R)); last first.
        {
          rewrite -addn1 -addnA leq_add2l addn1.
          apply leq_trans with (n := job_cost j); first by done.
          by specialize (PARAMS j); des; rewrite -JOBtsk.
        }
        unfold service; rewrite service_before_arrival_eq_service_during //.
        rewrite -big_split /=.
        apply leq_trans with (n := \sum_(job_arrival j i < job_arrival j + R) 1);
          first by rewrite big_const_nat iter_addn mul1n addn0 addKn.
        rewrite big_nat_cond [\sum_(_ _ < _ | true) _]big_nat_cond.
        apply leq_sum; movei /andP [/andP [GEi LTi] _].
        destruct (backlogged job_cost sched j i) eqn:BACK;
          first by rewrite -addn1 addnC; apply leq_add.
        apply negbT in BACK.
        rewrite add0n lt0n -not_scheduled_no_service negbK.
        rewrite /backlogged negb_and negbK in BACK.
        move: BACK ⇒ /orP [/negP NOTPENDING | SCHED]; last by done.
        exfalso; apply NOTPENDING; unfold pending; apply/andP; split; first by done.
        apply/negP; red; intro BUG; apply NOTCOMP'.
        by apply completion_monotonic with (t := i); try (by done); apply ltnW.
      Qed.

      (* 1) Next, we prove that during the scheduling window of j, any job that is
            scheduled while j is backlogged comes from a different task.
            This follows from the fact that j is the first job not to complete
            by its response-time bound, so previous jobs of j's task must have
            completed by their periods and cannot be pending. *)

      Lemma bertogna_edf_interference_by_different_tasks :
         t j_other,
          job_arrival j t < job_arrival j + R
          backlogged job_cost sched j t
          scheduled sched j_other t
          job_task j_other tsk.
      Proof.
        rename H_all_jobs_from_taskset into FROMTS,
               H_valid_task_parameters into PARAMS,
               H_job_of_tsk into JOBtsk, H_sporadic_tasks into SPO,
               H_work_conserving into WORK,
               H_tsk_R_in_rt_bounds into INbounds,
               H_all_previous_jobs_completed_on_time into BEFOREok,
               H_tasks_miss_no_deadlines into NOMISS,
               H_constrained_deadlines into CONSTR.
        movet j_other /andP [LEt GEt] BACK SCHED.
        apply/eqP; red; intro SAMEtsk.
        move: SCHED ⇒ /existsP [cpu SCHED].
        assert (SCHED': scheduled sched j_other t).
          by apply/existsP; cpu.
        clear SCHED; rename SCHED' into SCHED.
        move: (SCHED) ⇒ PENDING.
        apply scheduled_implies_pending with (job_cost0 := job_cost) in PENDING; try (by done).
        destruct (ltnP (job_arrival j_other) (job_arrival j)) as [BEFOREother | BEFOREj].
         {
          move: (BEFOREother) ⇒ LT; rewrite -(ltn_add2r R) in LT.
          specialize (BEFOREok j_other tsk R SAMEtsk INbounds LT).
          move: PENDING ⇒ /andP [_ /negP NOTCOMP]; apply NOTCOMP.
          apply completion_monotonic with (t0 := job_arrival j_other + R); try (by done).
          apply leq_trans with (n := job_arrival j); last by done.
          apply leq_trans with (n := job_arrival j_other + task_deadline tsk);
            first by rewrite leq_add2l; apply NOMISS.
          apply leq_trans with (n := job_arrival j_other + task_period tsk);
            first by rewrite leq_add2l; apply CONSTR; rewrite -JOBtsk FROMTS.
          rewrite -SAMEtsk; apply SPO; [ | by rewrite JOBtsk | by apply ltnW].
          by red; intro EQ; subst; rewrite ltnn in BEFOREother.
        }
        {
          move: PENDING ⇒ /andP [ARRIVED _].
          exploit (SPO j j_other); [ | by rewrite SAMEtsk | by done | ]; last first.
          {
            apply/negP; rewrite -ltnNge.
            apply leq_ltn_trans with (n := t); first by done.
            apply leq_trans with (n := job_arrival j + R); first by done.
            by rewrite leq_add2l; apply leq_trans with (n := task_deadline tsk);
              [by apply NOMISS | by rewrite JOBtsk CONSTR // -JOBtsk FROMTS].
          }
          by red; intros EQtsk; subst; rewrite /backlogged SCHED andbF in BACK.
        }
      Qed.

      (* 2) In order to use the lemmas in constrained_deadlines.v, we show that
            all jobs released before the end of the interval complete by their
            periods. This follows trivially from the hypothesis that all jobs
            before (job_arrival j + R) complete by their response-time bounds. 
            With this lemma, we can conclude that during job j's scheduling
            window there cannot be multiple pending jobs of each task.*)

      Lemma bertogna_edf_all_previous_jobs_complete_by_their_period:
         t (j0: JobIn arr_seq),
          t < job_arrival j + R
          job_arrival j0 + task_period (job_task j0) t
          completed job_cost sched j0
             (job_arrival j0 + task_period (job_task j0)).
      Proof.
        rename H_rt_bounds_contains_all_tasks into UNZIP,
               H_constrained_deadlines into CONSTR,
               H_tasks_miss_no_deadlines into NOMISS,
               H_all_jobs_from_taskset into FROMTS,
               H_all_previous_jobs_completed_on_time into BEFOREok.
        intros t j0 LEt LE.
        cut ((job_task j0) unzip1 rt_bounds = true); last by rewrite UNZIP FROMTS.
        move ⇒ /mapP [p IN EQ]; destruct p as [tsk' R0]; simpl in *; subst tsk'.
        apply completion_monotonic with (t0 := job_arrival j0 + R0); first by done.
        {
          rewrite leq_add2l; apply leq_trans with (n := task_deadline (job_task j0));
            [by apply NOMISS | by apply CONSTR; rewrite FROMTS].
        }
        apply BEFOREok with (tsk_other := (job_task j0)); try by done.
        apply leq_ltn_trans with (n := t); last by done.
        apply leq_trans with (n := job_arrival j0 + task_period (job_task j0)); last by done.
        by rewrite leq_add2l; apply leq_trans with (n := task_deadline (job_task j0));
          [by apply NOMISS | apply CONSTR; rewrite FROMTS].
      Qed.

      (* Let's define a predicate to identify the other tasks that are scheduled. *)
      Let other_scheduled_task (t: time) (tsk_other: sporadic_task) :=
        task_is_scheduled job_task sched tsk_other t
        other_task tsk_other.

      (* 3) Now we prove that, at all times that j is backlogged, the number
            of tasks other than tsk that are scheduled is exactly the number
            of processors in the system. This is required to prove lemma (4). *)

      Lemma bertogna_edf_all_cpus_are_busy:
         t,
          job_arrival j t < job_arrival j + R
          backlogged job_cost sched j t
          count (other_scheduled_task t) ts = num_cpus.
      Proof.
        rename H_all_jobs_from_taskset into FROMTS,
               H_valid_task_parameters into PARAMS,
               H_job_of_tsk into JOBtsk,
               H_sporadic_tasks into SPO,
               H_tsk_R_in_rt_bounds into INbounds,
               H_all_previous_jobs_completed_on_time into BEFOREok,
               H_tasks_miss_no_deadlines into NOMISS,
               H_rt_bounds_contains_all_tasks into UNZIP,
               H_constrained_deadlines into RESTR,
               H_work_conserving into WORK.
        unfold x, X, total_interference, task_interference.
        movet /andP [LEt LTt] BACK.
        eapply platform_cpus_busy_with_interfering_tasks; try (by done);
          [ by apply WORK | by apply SPO
          | apply PARAMS; rewrite -JOBtsk; apply FROMTS
          | by apply JOBtsk | by apply BACK | ].
        {
          intros j0 tsk0 TSK0 LE.
          cut (tsk0 unzip1 rt_bounds = true); last by rewrite UNZIP -TSK0 FROMTS.
          move ⇒ /mapP [p IN EQ]; destruct p as [tsk' R0]; simpl in *; subst tsk'.
          apply completion_monotonic with (t0 := job_arrival j0 + R0); try (by done).
          {
            rewrite leq_add2l TSK0.
            apply leq_trans with (n := task_deadline tsk0); first by apply NOMISS.
            by apply RESTR; rewrite -TSK0 FROMTS.
          }
          {
            apply BEFOREok with (tsk_other := tsk0); try (by done).
            apply leq_ltn_trans with (n := t); last by done.
            apply leq_trans with (n := job_arrival j0 + task_period tsk0); last by done.
            rewrite leq_add2l; apply leq_trans with (n := task_deadline tsk0); first by apply NOMISS.
            by apply RESTR; rewrite -TSK0 FROMTS.
          }
        }
      Qed.

      (* 4) Next, we prove that the sum of the interference of each task is equal
            to the total interference multiplied by the number of processors. This
            holds because interference only occurs when all processors are busy.
            With this lemma we can relate per-task interference with the total
            interference incurred by j (backlogged time). *)

      Lemma bertogna_edf_interference_on_all_cpus :
        \sum_(tsk_k <- other_tasks) x tsk_k = X × num_cpus.
      Proof.
        have DIFFTASK := bertogna_edf_interference_by_different_tasks.
        rename H_all_jobs_from_taskset into FROMTS,
               H_valid_task_parameters into PARAMS,
               H_job_of_tsk into JOBtsk, H_sporadic_tasks into SPO,
               H_work_conserving into WORK,
               H_tsk_R_in_rt_bounds into INbounds,
               H_all_previous_jobs_completed_on_time into BEFOREok,
               H_tasks_miss_no_deadlines into NOMISS,
               H_rt_bounds_contains_all_tasks into UNZIP,
               H_constrained_deadlines into CONSTR.
        unfold sporadic_task_model in ×.
        unfold x, X, total_interference, task_interference.
        rewrite -big_mkcond -exchange_big big_distrl /= mul1n.
        rewrite [\sum_(_ _ < _ | backlogged _ _ _ _) _]big_mkcond.
        apply eq_big_nat; movet /andP [GEt LTt].
        destruct (backlogged job_cost sched j t) eqn:BACK; last first.
        {
          rewrite (eq_bigr (fun i ⇒ 0));
            first by rewrite big_const_seq iter_addn mul0n addn0.
          by intros i _; rewrite (eq_bigr (fun i ⇒ 0));
            first by rewrite big_const_seq iter_addn mul0n addn0.
        }
        rewrite big_mkcond /=.
        rewrite exchange_big /=.
        apply eq_trans with (y := \sum_(cpu < num_cpus) 1); last by simpl_sum_const.
        apply eq_bigr; intros cpu _.
        move: (WORK j t BACK cpu) ⇒ [j_other /eqP SCHED]; unfold scheduled_on in ×.
        rewrite (bigD1_seq (job_task j_other)) /=; last by rewrite filter_uniq; destruct ts.
        {
          rewrite (eq_bigr (fun i ⇒ 0));
            last by intros i DIFF; rewrite /task_scheduled_on SCHED;apply/eqP;rewrite eqb0 eq_sym.
          rewrite big_const_seq iter_addn mul0n 2!addn0; apply/eqP; rewrite eqb1.
          by unfold task_scheduled_on; rewrite SCHED.
        }
        rewrite mem_filter; apply/andP; split; last by apply FROMTS.
        apply DIFFTASK with (t := t); [by auto | by done |].
        by apply/existsP; cpu; apply/eqP.
      Qed.

      (* Before stating the next lemma, let (num_tasks_exceeding delta) be the
         number of interfering tasks whose interference x is larger than delta. *)

      Let num_tasks_exceeding delta := count (fun ix i delta) (other_tasks).

      (* 5) Now we prove that, for any delta, if (num_task_exceeding delta > 0), then the
            cumulative interference caused by the complementary set of interfering tasks fills
            the remaining, not-completely-full (num_cpus - num_tasks_exceeding delta)
            processors. *)

      Lemma bertogna_edf_interference_in_non_full_processors :
         delta,
          0 < num_tasks_exceeding delta < num_cpus
          \sum_(i <- other_tasks | x i < delta) x i delta × (num_cpus - num_tasks_exceeding delta).
      Proof.
        have COMP := bertogna_edf_all_previous_jobs_complete_by_their_period.
        have INV := bertogna_edf_all_cpus_are_busy.
        rename H_all_jobs_from_taskset into FROMTS,
               H_valid_task_parameters into PARAMS,
               H_job_of_tsk into JOBtsk,
               H_sporadic_tasks into SPO,
               H_tsk_R_in_rt_bounds into INbounds,
               H_all_previous_jobs_completed_on_time into BEFOREok,
               H_tasks_miss_no_deadlines into NOMISS,
               H_constrained_deadlines into CONSTR,
               H_sequential_jobs into SEQ.
        unfold sporadic_task_model in ×.
        movedelta /andP [HAS LT].
        rewrite -has_count in HAS.

        set some_interference_A := fun t
          has (fun tsk_kbacklogged job_cost sched j t
                            (x tsk_k delta)
                            task_is_scheduled job_task sched tsk_k t) other_tasks.
        set total_interference_B := fun t
            backlogged job_cost sched j t ×
            count (fun tsk_k(x tsk_k < delta)
                  task_is_scheduled job_task sched tsk_k t) other_tasks.

        apply leq_trans with ((\sum_(job_arrival j t < job_arrival j + R)
                              some_interference_A t) × (num_cpus - num_tasks_exceeding delta)).
        {
          rewrite leq_mul2r; apply/orP; right.
          move: HAS ⇒ /hasP HAS; destruct HAS as [tsk_a INa LEa].
          apply leq_trans with (n := x tsk_a); first by apply LEa.
          unfold x, task_interference, some_interference_A.
          apply leq_sum_nat; movet /andP [GEt LTt] _.
          destruct (backlogged job_cost sched j t) eqn:BACK;
            last by rewrite (eq_bigr (fun x ⇒ 0)); [by simpl_sum_const | by ins].
          destruct ([ cpu, task_scheduled_on job_task sched tsk_a cpu t]) eqn:SCHED;
            last first.
          {
            apply negbT in SCHED; rewrite negb_exists in SCHED; move: SCHED ⇒ /forallP ALL.
            rewrite (eq_bigr (fun x ⇒ 0)); first by simpl_sum_const.
            by intros cpu _; specialize (ALL cpu); apply negbTE in ALL; rewrite ALL.
          }
          move: SCHED ⇒ /existsP [cpu SCHED].
          apply leq_trans with (n := 1); last first.
          {
            rewrite lt0b; apply/hasP; tsk_a; first by done.
            by rewrite LEa 2!andTb; apply/existsP; cpu.
          }
          rewrite (bigD1 cpu) /= // SCHED.
          rewrite (eq_bigr (fun x ⇒ 0)); first by simpl_sum_const; rewrite leq_b1.
          intros cpu' DIFF.
          apply/eqP; rewrite eqb0; apply/negP.
          intros SCHED'.
          move: DIFF ⇒ /negP DIFF; apply DIFF; apply/eqP.
          unfold task_scheduled_on in ×.
          destruct (sched cpu t) as [j1|] eqn:SCHED1; last by done.
          destruct (sched cpu' t) as [j2|] eqn:SCHED2; last by done.
          move: SCHED SCHED' ⇒ /eqP JOB /eqP JOB'.
          subst tsk_a; symmetry in JOB'.
          assert (PENDING1: pending job_cost sched j1 t).
          {
            apply scheduled_implies_pending; try by done.
            by apply/existsP; cpu; apply/eqP.
          }
          assert (PENDING2: pending job_cost sched j2 t).
          {
            apply scheduled_implies_pending; try by done.
            by apply/existsP; cpu'; apply/eqP.
          }
          assert (BUG: j1 = j2).
          {
            apply platform_at_most_one_pending_job_of_each_task with (task_cost0 := task_cost)
            (task_period0 := task_period) (task_deadline0 := task_deadline) (tsk0 := tsk)
            (job_cost0 := job_cost) (job_task0 := job_task) (sched0 := sched) (j0 := j) (t0 := t);
            rewrite ?JOBtsk ?SAMEtsk //; first by apply PARAMS; rewrite -JOBtsk FROMTS.
            intros j0 tsk0 TSK0 LE.
            by apply (COMP t); rewrite ?TSK0.
          }
          by subst j2; apply SEQ with (j := j1) (t := t).
        }

        apply leq_trans with (\sum_(job_arrival j t < job_arrival j + R)
                                   total_interference_B t).
        {
          rewrite big_distrl /=.
          apply leq_sum_nat; movet LEt _.
          unfold some_interference_A, total_interference_B.
          destruct (backlogged job_cost sched j t) eqn:BACK;
            [rewrite mul1n /= | by rewrite has_pred0 //].

          destruct (has (fun tsk_k : sporadic_task(delta x tsk_k)
                     task_is_scheduled job_task sched tsk_k t) other_tasks) eqn:HAS';
            last by done.
          rewrite mul1n; move: HAS ⇒ /hasP [tsk_k INk LEk].
          unfold num_tasks_exceeding.
          apply leq_trans with (n := num_cpus -
                       count (fun i(x i delta)
                          task_is_scheduled job_task sched i t) other_tasks).
          {
            apply leq_sub2l.
            rewrite -2!sum1_count big_mkcond /=.
            rewrite [\sum_(_ <- _ | _ _)_]big_mkcond /=.
            apply leq_sum; intros i _.
            by destruct (task_is_scheduled job_task sched i t);
              [by rewrite andbT | by rewrite andbF].
          }
          rewrite -count_filter -[count _ other_tasks]count_filter.
          eapply leq_trans with (n := count (predC (fun tskdelta x tsk)) _);
            last by apply eq_leq, eq_in_count; red; ins; rewrite ltnNge.
          rewrite leq_subLR count_predC size_filter.
          by apply leq_trans with (n := count (other_scheduled_task t) ts);
            [by rewrite INV | by rewrite count_filter].
        }
        {
          unfold x at 2, total_interference_B.
          rewrite exchange_big /=; apply leq_sum; intros t _.
          destruct (backlogged job_cost sched j t) eqn:BACK; last by ins.
          rewrite mul1n -sum1_count.
          rewrite big_mkcond [\sum_(i <- other_tasks | _ < _) _]big_mkcond /=.
          apply leq_sum_seq; movetsk_k IN _.
          destruct (x tsk_k < delta); [rewrite andTb | by rewrite andFb].
          destruct (task_is_scheduled job_task sched tsk_k t) eqn:SCHED; last by done.
          move: SCHED ⇒ /existsP [cpu SCHED].
          by rewrite (bigD1 cpu) /= // SCHED.
        }
      Qed.

      (* 6) Based on lemma (5), we prove that, for any interval delta, if the sum of per-task
            interference exceeds (delta * num_cpus), the same applies for the
            sum of the minimum of the interference and delta. *)

      Lemma bertogna_edf_minimum_exceeds_interference :
         delta,
          \sum_(tsk_k <- other_tasks) x tsk_k delta × num_cpus
             \sum_(tsk_k <- other_tasks) minn (x tsk_k) delta
             delta × num_cpus.
      Proof.
        intros delta SUMLESS.
        set more_interf := fun tsk_kx tsk_k delta.
        rewrite [\sum_(_ <- _) minn _ _](bigID more_interf) /=.
        unfold more_interf, minn.
        rewrite [\sum_(_ <- _ | delta _)_](eq_bigr (fun idelta));
          last by intros i COND; rewrite leqNgt in COND; destruct (delta > x i).
        rewrite [\sum_(_ <- _ | ¬_)_](eq_big (fun ix i < delta)
                                              (fun ix i));
          [| by red; ins; rewrite ltnNge
           | by intros i COND; rewrite -ltnNge in COND; rewrite COND].

        (* Case 1: num_tasks_exceeding = 0 *)
        destruct (¬ has (fun idelta x i) other_tasks) eqn:HASa.
        {
          rewrite [\sum_(_ <- _ | _ _) _]big_hasC; last by apply HASa.
          rewrite big_seq_cond; move: HASa ⇒ /hasPn HASa.
          rewrite add0n (eq_bigl (fun i(i other_tasks) true));
            last by red; intros tsk_k; destruct (tsk_k other_tasks) eqn:INk;
              [by rewrite andTb ltnNge; apply HASa | by rewrite andFb].
          by rewrite -big_seq_cond.
        } apply negbFE in HASa.

        (* Case 2: num_tasks_exceeding >= num_cpus *)
        destruct (num_tasks_exceeding delta num_cpus) eqn:CARD.
        {
          apply leq_trans with (delta × num_tasks_exceeding delta);
            first by rewrite leq_mul2l; apply/orP; right.
          unfold num_tasks_exceeding; rewrite -sum1_count big_distrr /=.
          rewrite -[\sum_(_ <- _ | _) _]addn0.
          by apply leq_add; [by apply leq_sum; ins; rewrite muln1|by ins].
        } apply negbT in CARD; rewrite -ltnNge in CARD.

        (* Case 3: num_tasks_exceeding < num_cpus *)
        rewrite big_const_seq iter_addn addn0; fold num_tasks_exceeding.
        apply leq_trans with (n := delta × num_tasks_exceeding delta +
                                   delta × (num_cpus - num_tasks_exceeding delta));
          first by rewrite -mulnDr subnKC //; apply ltnW.
        rewrite leq_add2l; apply bertogna_edf_interference_in_non_full_processors.
        by apply/andP; split; first by rewrite -has_count.
      Qed.

      (* 7) Next, using lemmas (0), (4) and (6) we prove that the reduction-based
            interference bound is not enough to cover the sum of the minima over all tasks
            (artifact of the proof by contradiction). *)

      Lemma bertogna_edf_sum_exceeds_total_interference:
        \sum_((tsk_other, R_other) <- rt_bounds | other_task tsk_other)
          minn (x tsk_other) (R - task_cost tsk + 1) > I tsk R.
      Proof.
        have GE_COST := bertogna_edf_R_other_ge_cost.
        have EXCEEDS := bertogna_edf_minimum_exceeds_interference.
        have ALLBUSY := bertogna_edf_interference_on_all_cpus.
        have TOOMUCH := bertogna_edf_too_much_interference.
        rename H_rt_bounds_contains_all_tasks into UNZIP,
          H_response_time_is_fixed_point into REC.
        apply leq_trans with (n := \sum_(tsk_other <- other_tasks) minn (x tsk_other) (R - task_cost tsk + 1));
          last first.
        {
          rewrite (eq_bigr (fun iminn (x (fst i)) (R - task_cost tsk + 1)));
            last by ins; destruct i.
          move: UNZIPUNZIP.
          assert (FILTER: filter other_task (unzip1 rt_bounds) =
                          filter other_task ts).
            by f_equal.
          unfold other_tasks; rewrite -FILTER; clear FILTER.
          rewrite -[\sum_(_ <- rt_bounds | _)_]big_filter.
          assert (SUBST: [seq i <- rt_bounds
                           | let '(tsk_other, _) := i in other_task tsk_other] =
                         [seq i <- rt_bounds | other_task (fst i)]).
          {
            by apply eq_filter; red; intro i; destruct i.
          } rewrite SUBST; clear SUBST.
          have MAP := big_map (fun xfst x) (fun itrue) (fun iminn (x i) (R - task_cost tsk + 1)).
          by rewrite -MAP; apply eq_leq; f_equal; rewrite filter_map.
        }
        
        apply ltn_div_trunc with (d := num_cpus); first by apply H_at_least_one_cpu.
        rewrite -(ltn_add2l (task_cost tsk)) -REC; last by done.
        rewrite -addn1 -leq_subLR.
        rewrite -[R + 1 - _]subh1; last by apply GE_COST.
        rewrite leq_divRL; last by apply H_at_least_one_cpu.
        apply EXCEEDS.
        apply leq_trans with (n := X × num_cpus);
          last by rewrite ALLBUSY.
        by rewrite leq_mul2r; apply/orP; right; apply TOOMUCH.
      Qed.

      (* 8) After concluding that the sum of the minima exceeds (R - e_i + 1),
            we prove that there exists a tuple (tsk_k, R_k) that satisfies
            min (x_k, R - e_i + 1) > min (W_k, I_edf, R - e_i + 1).
            This implies that either x_k > W_k or x_k > I_edf, which is a contradiction,
            since both W_k and I_edf are valid task interference bounds. *)

      Lemma bertogna_edf_exists_task_that_exceeds_bound :
         tsk_other R_other,
          (tsk_other, R_other) rt_bounds
          (minn (x tsk_other) (R - task_cost tsk + 1) > interference_bound tsk_other R_other).
      Proof.
        have SUM := bertogna_edf_sum_exceeds_total_interference.
        have BOUND := bertogna_edf_workload_bounds_interference.
        have EDFBOUND := bertogna_edf_specific_bound_holds.
        rename H_rt_bounds_contains_all_tasks into UNZIP.
        assert (HAS: has (fun tup : task_with_response_time
                            let (tsk_other, R_other) := tup in
                            (tsk_other ts) other_task tsk_other
                              (minn (x tsk_other) (R - task_cost tsk + 1) >
                              interference_bound tsk_other R_other))
                         rt_bounds).
        {
          apply/negP; unfold not; intro NOTHAS.
          move: NOTHAS ⇒ /negP /hasPn ALL.
          rewrite -[_ < _]negbK in SUM.
          move: SUM ⇒ /negP SUM; apply SUM; rewrite -leqNgt.
          unfold I, total_interference_bound_edf.
          rewrite big_seq_cond [\sum_(_ <- _ | let _ := _ in _)_]big_seq_cond.
          apply leq_sum; movetsk_k /andP [INBOUNDSk INTERFk]; destruct tsk_k as [tsk_k R_k].
          specialize (ALL (tsk_k, R_k) INBOUNDSk).
          unfold interference_bound_edf; simpl in ×.
          rewrite leq_min; apply/andP; split.
          {
            unfold interference_bound; rewrite leq_min; apply/andP; split;
              last by rewrite geq_minr.
            apply leq_trans with (n := x tsk_k); first by rewrite geq_minl.
            by apply BOUND.
          }
          {
            apply leq_trans with (n := x tsk_k); first by rewrite geq_minl.
            by apply EDFBOUND.
          }
        }
        move: HAS ⇒ /hasP HAS; destruct HAS as [[tsk_k R_k] HPk MIN].
        move: MIN ⇒ /andP [/andP [INts INTERFk] MINk].
        by tsk_k, R_k; repeat split.
      Qed.

      End DerivingContradiction.

    End Lemmas.

    Section MainProof.

      (* Let (tsk, R) be any task to be analyzed, with its response-time bound R. *)
      Variable tsk: sporadic_task.
      Variable R: time.
      Hypothesis H_tsk_R_in_rt_bounds: (tsk, R) rt_bounds.

      (* Using the lemmas above, we prove that R bounds the response time of task tsk. *)
      Theorem bertogna_cirinei_response_time_bound_edf :
        response_time_bounded_by tsk R.
      Proof.
        intros j JOBtsk.

        (* First, rewrite the claim in terms of the *absolute* response-time bound (arrival + R) *)
        remember (job_arrival j + R) as ctime.

        revert H_tsk_R_in_rt_bounds.
        generalize dependent R; generalize dependent tsk; generalize dependent j.

        (* Now, we apply strong induction on the absolute response-time bound. *)
        induction ctime as [ctime IH] using strong_ind.

        intros j tsk' JOBtsk R' EQc INbounds; subst ctime.

        (* First, let's simplify the induction hypothesis. *)
        assert (BEFOREok: (j0: JobIn arr_seq) tsk R0,
                                 job_task j0 = tsk
                               (tsk, R0) rt_bounds
                               job_arrival j0 + R0 < job_arrival j + R'
                               service sched j0 (job_arrival j0 + R0) = job_cost j0).
        {
            by ins; apply IH with (tsk := tsk0) (R := R0).
        }
        clear IH.

        (* The proof follows by contradiction. Assume that job j does not complete by its
           response-time bound. By the induction hypothesis, all jobs with absolute
           response-time bound t < (job_arrival j + R) have correct response-time bounds. *)

        destruct (completed job_cost sched j (job_arrival j + R')) eqn:NOTCOMP;
          first by done.
        apply negbT in NOTCOMP; exfalso.

        (* Next, we derive a contradiction using the previous lemmas. *)
        exploit (bertogna_edf_exists_task_that_exceeds_bound tsk' R' INbounds j JOBtsk NOTCOMP).
        {
          by ins; apply IH with (tsk := tsk_other) (R := R_other).
        }
        intro EX; destruct EX as [tsk_other [R_other [HP LTmin]]].
        unfold interference_bound_edf, interference_bound_generic in LTmin.
        rewrite minnAC in LTmin; apply min_lt_same in LTmin.
        have BASICBOUND := bertogna_edf_workload_bounds_interference R' j BEFOREok tsk_other R_other HP.
        have EDFBOUND := (bertogna_edf_specific_bound_holds tsk' R' INbounds j JOBtsk BEFOREok tsk_other R_other HP).
        unfold minn in LTmin; clear -LTmin HP BASICBOUND EDFBOUND tsk; desf.
        {
          by apply (leq_ltn_trans BASICBOUND) in LTmin; rewrite ltnn in LTmin.
        }
        {
          by apply (leq_ltn_trans EDFBOUND) in LTmin; rewrite ltnn in LTmin.
        }
      Qed.

    End MainProof.

  End ResponseTimeBound.

End ResponseTimeAnalysisEDF.