Library rt.analysis.uni.susp.dynamic.jitter.jitter_schedule
Require Import rt.util.all.
Require Import rt.model.priority rt.model.suspension.
Require Import rt.model.arrival.basic.arrival_sequence.
Require Import rt.model.schedule.uni.jitter.schedule.
Require Import rt.model.schedule.uni.transformation.construction.
(* In this file, we formalize a reduction from a suspension-aware schedule
to a jitter-aware schedule. *)
Module JitterScheduleConstruction.
Import UniprocessorScheduleWithJitter Suspension Priority ScheduleConstruction.
Section ConstructingJitterSchedule.
Context {Task: eqType}.
Context {Job: eqType}.
Variable job_arrival: Job → time.
Variable job_task: Job → Task.
Require Import rt.model.priority rt.model.suspension.
Require Import rt.model.arrival.basic.arrival_sequence.
Require Import rt.model.schedule.uni.jitter.schedule.
Require Import rt.model.schedule.uni.transformation.construction.
(* In this file, we formalize a reduction from a suspension-aware schedule
to a jitter-aware schedule. *)
Module JitterScheduleConstruction.
Import UniprocessorScheduleWithJitter Suspension Priority ScheduleConstruction.
Section ConstructingJitterSchedule.
Context {Task: eqType}.
Context {Job: eqType}.
Variable job_arrival: Job → time.
Variable job_task: Job → Task.
Basic Setup & Setting
(* Consider any job arrival sequence. *)
Variable arr_seq: arrival_sequence Job.
(* Assume any FP policy and the corresponding job-level priority relation. *)
Variable higher_eq_priority: FP_policy Task.
Let job_higher_eq_priority := FP_to_JLFP job_task higher_eq_priority.
(* Consider the original job and task costs from the suspension-aware schedule... *)
Variable job_cost: Job → time.
Variable task_cost: Task → time.
(* ...and assume that jobs have associated suspension times. *)
Variable job_suspension_duration: job_suspension Job.
(* Next, consider any suspension-aware schedule of the arrival sequence. *)
Variable sched_susp: schedule Job.
Definition of the Reduction
(* Now we proceed with the reduction. Let j be the job to be analyzed. *)
Variable j: Job.
(* For simplicity, we give some local names for the parameters of this job... *)
Let arr_j := job_arrival j.
Let task_of_j := job_task j.
(* ...and recall the definition of other higher-or-equal-priority tasks. *)
Let other_hep_task tsk_other :=
higher_eq_priority tsk_other task_of_j && (tsk_other != task_of_j).
(* Moreover, assume that jobs from higher-priority tasks are associated a response-time bound R. *)
Variable R: Job → time.
(* Now we are going to redefine the job parameters for the new schedule. *)
Section DefiningJobParameters.
(* First, we inflate job costs with suspension time. *)
Section CostInflation.
(* Recall the total suspension time of a job in the original schedule. *)
Let job_total_suspension :=
total_suspension job_cost job_suspension_duration.
(* We inflate job costs as follows.
(a) The cost of job j is inflated with its total suspension time.
(b) The cost of all other jobs remains unchanged. *)
Definition inflated_job_cost (any_j: Job) :=
if any_j == j then
job_cost any_j + job_total_suspension any_j
else
job_cost any_j.
End CostInflation.
(* Next, we show how to set the job jitter in the new schedule
to compensate for the suspension times. *)
Section ConvertingSuspensionToJitter.
(* Let any_j be any job in the new schedule. *)
Variable any_j: Job.
(* First, recall the distance between any_j and job j that is to be analyzed.
Note that since we use natural numbers, this distance saturates to 0 if
any_j arrives later than j. *)
Let distance_to_j := job_arrival j - job_arrival any_j.
(* Then, we define the actual job jitter in the new schedule as follows.
a) For every job of higher-priority tasks (with respect to job j), the jitter is set to
the minimum between the distance to j and the term (R any_j - job_cost any_j).
b) The remaining jobs have no jitter.
The intuition behind this formula is that any_j is to be released as close to job j as
possible, while not "trespassing" the response-time bound (R any_j) from sched_susp,
which is only assumed to be valid for higher-priority tasks. *)
Definition job_jitter :=
if other_hep_task (job_task any_j) then
minn distance_to_j (R any_j - job_cost any_j)
else 0.
End ConvertingSuspensionToJitter.
End DefiningJobParameters.
Schedule Construction
(* Next we generate a jitter-aware schedule using the job parameters above.
For that, we always pick the highest-priority pending job (after jitter) in
the new schedule. However, if there are multiple highest-priority jobs, we
try not to schedule job j in order to maximize interference. *)
Section ScheduleConstruction.
(* First, we define the schedule construction function. *)
Section ConstructionStep.
(* For any time t, suppose that we have generated the schedule prefix in the
interval [0, t). Then, we must define what should be scheduled at time t. *)
Variable sched_prefix: schedule Job.
Variable t: time.
(* For simplicity, let's define some local names. *)
Let job_is_pending := pending job_arrival inflated_job_cost job_jitter sched_prefix.
Let actual_job_arrivals_up_to := actual_arrivals_up_to job_arrival job_jitter arr_seq.
Let lower_priority j1 j2 := ~~ job_higher_eq_priority j1 j2.
(* Next, consider the list of pending jobs at time t that are different from j
and whose jitter has passed, in the new schedule. *)
Definition pending_jobs_other_than_j :=
[seq j_other <- actual_job_arrivals_up_to t | job_is_pending j_other t & j_other != j].
(* From the list of pending jobs, we can return one of the (possibly many)
highest-priority jobs, or None, in case there are no pending jobs. *)
Definition highest_priority_job_other_than_j :=
seq_min job_higher_eq_priority pending_jobs_other_than_j.
(* Then, we construct the new schedule at time t as follows.
a) If job j is pending and the highest-priority job (other than j) has
lower priority than j, we have to schedule j.
b) Else, if job j is not pending, we pick one of the highest priority pending jobs. *)
Definition build_schedule : option Job :=
if job_is_pending j t then
if highest_priority_job_other_than_j is Some j_hp then
if lower_priority j_hp j then
Some j
else Some j_hp
else Some j
else highest_priority_job_other_than_j.
End ConstructionStep.
(* Finally, starting from the empty schedule, ...*)
Let empty_schedule : schedule Job := fun t ⇒ None.
(* ...we use the recursive definition above to construct the jitter-aware schedule. *)
Definition sched_jitter := build_schedule_from_prefixes build_schedule empty_schedule.
End ScheduleConstruction.
End ConstructingJitterSchedule.
End JitterScheduleConstruction.